BP TRuckstops
CLIENT: BP ⎪ PROGRAMME: 4 weeks ⎪ SITE AREA: Various North Island Locations
BP TRUCKSTOP ASPHALT REPAIRS
Various BP truckstops through out the North Island required refurbishing due to heavy vehicle damage
Work was conducted in a manner to ensure the sites were still accessible to heavy vehicles.
Johnstone Construction liaised with local contractors to utilise their services and products